Package Management Dashboard
One operational view from package definition and procurement through design, manufacture, construction, assurance and handover.
Package Delivery Journey
Packages Requiring Attention
| Package | Stage | Health | Status | Value |
|---|---|---|---|---|
| RF-001Roofing & Waterproofing | procurement | 71% | amber | £3.2m |
| ME-001MEP Services | design | 76% | amber | £18.4m |
| FA-001Façade Package | preconstruction | 82% | amber | £14.6m |
| VT-001Vertical Transportation | preconstruction | 88% | green | £4.1m |
| ST-001Structural Frame | construction | 91% | green | £9.8m |
Package Brief
- FA-001 is operating under the client-led two-stage procurement model.
- Stage 3 independent Main Contractor validation is tracked separately from confidential client procurement history.
- Design, Structure and MEP package records are now linked to the existing Yazu Design data model.
- Organisation-controlled sharing is enabled at package record level.
Operational Workspaces
Define package boundaries, scope, interfaces, responsibilities, procurement route, assumptions and objectives.
Open workspace →Manage tender strategy, bidder engagement, evaluation, preferred bidder selection and approvals.
Open workspace →Integrated view of package design obligations, deliverables, RFIs, technical submissions, samples, mock-ups and design changes.
Open workspace →Control package milestones from design and procurement through manufacture, delivery, installation, testing and handover.
Open workspace →Maintain organisation-specific commercial baselines, package commitments, changes, forecasts and final account.
Open workspace →Track material release, production batches, factory inspections, FATs, NCRs, storage and shipment readiness.
Open workspace →Track site readiness, installation progress, labour, productivity, constraints and look-ahead commitments.
Open workspace →Manage ITPs, hold points, inspections, benchmarks, NCRs, defects and snagging by package and location.
Open workspace →Plan and evidence FAT, SAT, performance testing, witnessing, certification, failures and retesting.
Open workspace →Control O&Ms, as-builts, asset data, training, warranties, certificates, spares and outstanding defects.
Open workspace →Each organisation controls its own operational information. Records are shared intentionally, with permission and audit history retained when formally issued.