Package Health Dashboard
Project-wide control of every work package. Select a package below to enter its dedicated operational workspace.
All Work Packages
| Package | Delivery Party | Package Manager | Package QS | Stage | Health | Progress | Value | Status | Key Date | Access |
|---|---|---|---|---|---|---|---|---|---|---|
| RF-001Roofing & Waterproofing | Not appointed | Not assigned | Not assigned | procurement | 71% | 8% | £3.2m | active | — | project shared |
| ME-001MEP Services | Not appointed | Not assigned | Not assigned | design | 76% | 32% | £18.4m | active | — | project shared |
| FA-001Façade Package | Preferred Façade Specialist | Package Manager | Not assigned | preconstruction | 82% | 18% | £14.6m | active | 2028-06-30 | project shared |
| VT-001Vertical Transportation | Not appointed | Not assigned | Not assigned | preconstruction | 88% | 14% | £4.1m | active | — | project shared |
| ST-001Structural Frame | Not appointed | Not assigned | Not assigned | construction | 91% | 58% | £9.8m | active | — | project shared |
Package Delivery Journey
Packages Requiring Attention
Project Package Brief
- 2 packages currently require management attention.
- 4 packages have no named package manager.
- Package-level pages remain locked until a package is explicitly selected.
- Information visibility remains governed by organisation ownership and publication status.
Operational Controls
Define package boundaries, scope, interfaces, responsibilities, procurement route, assumptions and objectives.
Select package →Manage tender strategy, bidder engagement, evaluation, preferred bidder selection and approvals.
Select package →Integrated view of package design obligations, deliverables, RFIs, technical submissions, samples, mock-ups and design changes.
Select package →Control package milestones from design and procurement through manufacture, delivery, installation, testing and handover.
Select package →Maintain organisation-specific commercial baselines, package commitments, changes, forecasts and final account.
Select package →Track material release, production batches, factory inspections, FATs, NCRs, storage and shipment readiness.
Select package →Track site readiness, installation progress, labour, productivity, constraints and look-ahead commitments.
Select package →Manage ITPs, hold points, inspections, benchmarks, NCRs, defects and snagging by package and location.
Select package →Plan and evidence FAT, SAT, performance testing, witnessing, certification, failures and retesting.
Select package →Control O&Ms, as-builts, asset data, training, warranties, certificates, spares and outstanding defects.
Select package →Package selection establishes context; permissions determine whether the user can only view or can create, update, assign, approve and publish records.