Strategy & Scope
Define package boundaries, scope, interfaces, responsibilities, procurement route, assumptions and objectives. This workspace is restricted to FA-001 — Façade Package.
Live Scope Breakdown
interface • Slab edge, embeds, tolerances and movement coordination.
included • CWCT/performance testing, visual mock-ups, benchmarks and production testing.
included • Unitised and stick curtain wall systems including brackets, anchors, flashings and perimeter interfaces.
excluded • Primary steel and concrete frame by structural package.
assumption • Main Contractor validation to be based on issued Stage 3 design information and direct interaction with preferred specialist.
included • Specialist design development, calculations, drawings, BIM information and coordination.
Strategy & Scope Controls
Structured inclusions, exclusions and deliverables
Client, MC, consultant and specialist responsibilities
Client-led two-stage D&B with specialist novation