ST-001 · INTEGRATE
Design
Integrated view of package design obligations, deliverables, RFIs, technical submissions, samples, mock-ups and design changes. This workspace is restricted to ST-001 — Structural Frame.
Package Health91%green
Progress58%construction
Package Value£9.8mactive
Delivery PartyNot appointedManager not assigned
ST-001 CONTROL WORKSPACE
Selected-package records onlyDesign Controls
01
Open Yazu Design
IntegratedViewUse the existing Design app for detailed workflow control
02
Package Design Health
AmberViewAggregated design readiness for package release
03
Design Freeze
78%ViewTrack freeze gates against procurement and manufacture